Two-Year Lead Time Outlook

The annual outlook of dryness/wetness for 2021 and 2022 are shown below. DCV phases two years prior were used to make a dryness/wetness outlook based on the two-year transition probabilities of the DCV phases and the corresponding SPEI composites from 1951 to 2019(2018).

Choose an outlook year to display: